Mountain Hotel Tetřeví Boudy in Krkonoše
The hotel was built at an altitude of 1000 m in several stages between 1978 and 1986. The renovation and extension was carried out 2018–2020.
The hotel was built at an altitude of 1000 m in several stages between 1978 and 1986. The renovation and extension was carried out 2018–2020.